ELEMENTAL COST ANALYSIS - FORM 3                        9 - Building, Spaces in General
                                                        A - 3 - 12,970

Gross Floor Area :            SUMMARY OF ELEMENT COSTS  Tender date : December 2012
                    12,970 m2

             ELEMENT                                                         SPECIFICATION
 1 Substructure
1A Piling                         250mm x 250mm Precast Concrete Pile
1B Work Below Lowest Floor        Vibrated Reinforced Concrete in pile caps, column stumps, lift pits, ground beam, ground slab,
                                  apron slab and damp proof membrane
        Finish
 2 Superstructure                 Vibrated Reinforced Concrete in column, suspended floor beam, lift core wall and staircase
2A Frame                          wall.
2B Upper Floors                   Vibrated Reinforced Concrete suspended floor slab.
2C Roof                           Vibrated Reinforced Concrete suspended roof slab & roof beam, Reinforced concrete flat roof
                                  with reinforced concrete gutter and UPVC rainwater down pipe.
2D Staircase                      Roof overhang complete with 600mm diameter mild steel circular hollow section post 18m high
                                  with steel roof members and metal decking covering and finished with metal strip ceiling to soffit
2E External Walls                 complete with steel gutter with discharge outlets.
                                  Vibrated Reinforced Concrete in staircase, landing beam and slab, mild steel railing and and
2F Windows & External Doors       balustrading. Cement render with non-slip nosing tiles to staircase, skim coating with painting to
2G Internal Walls and Partition   soffit of staircase
2H Internal Doors                 1 no of structural steel staircase finished with timber strip flooring and complete with stainless
                                  steel railing and balustrading.
 3 Finishes                       Allowance for corrugated metal deck wall cladding to back and sides of wall externally.
3A Internal Wall Finishes         Half brick thick brickwall in common clay brick.
3B Internal Floor Finishes        Façade Curtain Walling - Powder Coated Aluminium framed with 37.52mm thick double glazed units
                                  infills (comprising 8mm ASG Clear Tempered Float with heat soaked + 1.52mm Clear PVB + 8mm ASG
3C Internal Ceiling Finishes      SNGY Clear Tempered with heat soaked with hard coated Low-E#4 + A12 + 8mm Clear Tempered
                                  Float with heat soaked) to southwest elevation and the other area using 12mm Thick ASG clear
3D External Finishes              tempered float glass with heat soaked with hard coated Low-E#4
 4 Fittings and Furnishing        Aluminium door, louvres door, timber flush door, roller shutter door, aluminium framed window
4A Fittings and Fixtures          and aluminium framed louvred window.
4B Furniture and Furnishings      115mm and 230mm thick brick wall with reinforcement in cement and sand (1:3) mortar.
4C Works of Art                   Fire rated solid timber door with overhead door closer and standard lockset to escape
4D Equipment                      staircase & M&E rooms. Timber flush door, louvres door, powder coated aluminium
                                  framed with 8mm thick tempered glass door to workshop area, meeting room, server; 12mm
                                  thick frameless tempered glass door to courtyard, conference and lounge area.
                                  All ironmongery to aluminium door shall be "Doric" or approved equivalent.

                                  Generally wall plastering with painting. Homogeneous wall tiles to toilets and kitchen only.
                                  Homogeneous floor tiles to showroom, car display, delivery bays, manager room, corridor and
                                  pantry area; Non-slip homogeneous tiles to toilets area; Timber flooring to customer lounge, café
                                  bar & Vip lounge area; Carpet tiles to sales manager room, closing rooms, cashier room and
                                  office area; Clinker tiles to inspection bay, work bay area and carpark area; Power float with
                                  floor hardeners to spare part, battery room, electric room and genset room.
                                  Fibrous plasterboard ceiling with painting to showroom, car display, lounge and conference
                                  room area. Moisture resistance laminated gypsum plaster board ceiling with painting to toilets,
                                  kitchen. Mineral fibre board to office area. Skim coated with painting to workshop, inspection bay,
                                  corridor and carparking area.
                                  Cement and sand plastering and weathershield painting.

                                  Counter top, mirror, built-in fitment and letter box.
                                  Sunshading (in-built blind mechanically operated) to curtail wall system.
                                  Not Applicable.
                                  Not Applicable.

 5 Services                       Pedestal water closet, squatting pan, wall hung basin, kitchen sink, toilet paper holder, shower
5A Sanitary Appliances            set and soap holder, bib tap, kitchen tap and floor trap.
                                  Hot and cold water services, sanitary soil, waste, vent pipes, pump and valves installation with
5B Plumbing Installation          and including all necessary accessories.
                                  Not Applicable.
5C Refuse Disposal                Split unit airconditioning to be provided at designated area and meachanical ventilation systems
5D Air Conditioning &             provided at workshop arae, common area, M&E rooms, toilets, spare spare room and etc.
                                  Electrical wiring excluding fittings, light and fan points, telephone wiring and points
        Ventilation System        Hose reel system, wet riser system.
5E Electrical Installation        Lift
5F Fire Protection Installation   Not applicable
5G Lift & Conveyor Installation   Not applicable
5H Communication Installation     3% of total Prime Cost Sums as Builder's profit and attendance for all prime cost sum
5J Special Installation
5K Builder's Profit & Attendance  Provision of provisional Sum of RM 355,000.00 for Builder's Work in connection with services.

        on Services               Roadwork, footpath, landscaping, fencing and gate.
5L Builder's Work in Connection   300mm Diameter pipe culvert, 225mm diameter half round glazed ware drain, 225mm Vitrified clay
                                  pipe sewerage pipe and mild steel grating
        with Services             Water reticulation with mild steel pipe and fittings , fire hydrant, valve and valve chamber.
                                  Guard house, TNB substation and refuse chamber.
 6 External Works                 Not applicable.
6A Site Work
6B Drainage

6C External Services
6D Ancillary Buildings
6E Recreational Facilities

68