Page 68 - Surveyor51_1and2_Web
P. 68
ELEMENTal COST ANALYSIS
The Malaysian Surveyor
ELEMENTAL COST ANALYSIS - FORM 3 9 - Building, Spaces in General
A - 3 - 12,970
Gross Floor Area : SUMMARY OF ELEMENT COSTS Tender date : December 2012
12,970 m2
ELEMENT SPECIFICATION
1 Substructure
1A Piling 250mm x 250mm Precast Concrete Pile
1B Work Below Lowest Floor Vibrated Reinforced Concrete in pile caps, column stumps, lift pits, ground beam, ground slab,
apron slab and damp proof membrane
Finish
2 Superstructure Vibrated Reinforced Concrete in column, suspended floor beam, lift core wall and staircase
2A Frame wall.
2B Upper Floors Vibrated Reinforced Concrete suspended floor slab.
2C Roof Vibrated Reinforced Concrete suspended roof slab & roof beam, Reinforced concrete flat roof
with reinforced concrete gutter and UPVC rainwater down pipe.
2D Staircase Roof overhang complete with 600mm diameter mild steel circular hollow section post 18m high
with steel roof members and metal decking covering and finished with metal strip ceiling to soffit
2E External Walls complete with steel gutter with discharge outlets.
Vibrated Reinforced Concrete in staircase, landing beam and slab, mild steel railing and and
2F Windows & External Doors balustrading. Cement render with non-slip nosing tiles to staircase, skim coating with painting to
2G Internal Walls and Partition soffit of staircase
2H Internal Doors 1 no of structural steel staircase finished with timber strip flooring and complete with stainless
steel railing and balustrading.
3 Finishes Allowance for corrugated metal deck wall cladding to back and sides of wall externally.
3A Internal Wall Finishes Half brick thick brickwall in common clay brick.
3B Internal Floor Finishes Façade Curtain Walling - Powder Coated Aluminium framed with 37.52mm thick double glazed units
infills (comprising 8mm ASG Clear Tempered Float with heat soaked + 1.52mm Clear PVB + 8mm ASG
3C Internal Ceiling Finishes SNGY Clear Tempered with heat soaked with hard coated Low-E#4 + A12 + 8mm Clear Tempered
Float with heat soaked) to southwest elevation and the other area using 12mm Thick ASG clear
3D External Finishes tempered float glass with heat soaked with hard coated Low-E#4
4 Fittings and Furnishing Aluminium door, louvres door, timber flush door, roller shutter door, aluminium framed window
4A Fittings and Fixtures and aluminium framed louvred window.
4B Furniture and Furnishings 115mm and 230mm thick brick wall with reinforcement in cement and sand (1:3) mortar.
4C Works of Art Fire rated solid timber door with overhead door closer and standard lockset to escape
4D Equipment staircase & M&E rooms. Timber flush door, louvres door, powder coated aluminium
framed with 8mm thick tempered glass door to workshop area, meeting room, server; 12mm
thick frameless tempered glass door to courtyard, conference and lounge area.
All ironmongery to aluminium door shall be "Doric" or approved equivalent.
Generally wall plastering with painting. Homogeneous wall tiles to toilets and kitchen only.
Homogeneous floor tiles to showroom, car display, delivery bays, manager room, corridor and
pantry area; Non-slip homogeneous tiles to toilets area; Timber flooring to customer lounge, café
bar & Vip lounge area; Carpet tiles to sales manager room, closing rooms, cashier room and
office area; Clinker tiles to inspection bay, work bay area and carpark area; Power float with
floor hardeners to spare part, battery room, electric room and genset room.
Fibrous plasterboard ceiling with painting to showroom, car display, lounge and conference
room area. Moisture resistance laminated gypsum plaster board ceiling with painting to toilets,
kitchen. Mineral fibre board to office area. Skim coated with painting to workshop, inspection bay,
corridor and carparking area.
Cement and sand plastering and weathershield painting.
Counter top, mirror, built-in fitment and letter box.
Sunshading (in-built blind mechanically operated) to curtail wall system.
Not Applicable.
Not Applicable.
5 Services Pedestal water closet, squatting pan, wall hung basin, kitchen sink, toilet paper holder, shower
5A Sanitary Appliances set and soap holder, bib tap, kitchen tap and floor trap.
Hot and cold water services, sanitary soil, waste, vent pipes, pump and valves installation with
5B Plumbing Installation and including all necessary accessories.
Not Applicable.
5C Refuse Disposal Split unit airconditioning to be provided at designated area and meachanical ventilation systems
5D Air Conditioning & provided at workshop arae, common area, M&E rooms, toilets, spare spare room and etc.
Electrical wiring excluding fittings, light and fan points, telephone wiring and points
Ventilation System Hose reel system, wet riser system.
5E Electrical Installation Lift
5F Fire Protection Installation Not applicable
5G Lift & Conveyor Installation Not applicable
5H Communication Installation 3% of total Prime Cost Sums as Builder's profit and attendance for all prime cost sum
5J Special Installation
5K Builder's Profit & Attendance Provision of provisional Sum of RM 355,000.00 for Builder's Work in connection with services.
on Services Roadwork, footpath, landscaping, fencing and gate.
5L Builder's Work in Connection 300mm Diameter pipe culvert, 225mm diameter half round glazed ware drain, 225mm Vitrified clay
pipe sewerage pipe and mild steel grating
with Services Water reticulation with mild steel pipe and fittings , fire hydrant, valve and valve chamber.
Guard house, TNB substation and refuse chamber.
6 External Works Not applicable.
6A Site Work
6B Drainage
6C External Services
6D Ancillary Buildings
6E Recreational Facilities
68