Page 38 - Surveyor51.3 WEB
P. 38

ELEMENTal COST ANALYSIS

The Malaysian Surveyor

    ROYAL INSTITUTION OF SURVEYOR MALAYSIA
    BUILDING COST INFORMATION CENTRE

    ELEMENTAL COST ANALYSIS - Form 3        BRIEF SPECIFICATION                                         4 - Health & Welfare
    GROSS FLOOR AREA : 1420 m²                                                                          A - 1 - 1420

                                                                                         TENDER DATE : 28/8/2014

                        ELEMENT                                                             SPECIFICATION
     1 Substructure
    1A Piling                             2000mm x 200mm Precast concrete pile
    1B Work Below Lowest Floor Finish     Vibrated reinforced concrete Grade 25

     2 Superstructure                     Vibrated reinforced concrete Grade 30
    2A Frame                              - Not Applicable-
    2B Upper Floors                       Reinforced concrete Grade 25 roof slab, metal decking roofing on steel roof truss, uPVC
    2C Roof                               rainwater downpipe accessories

    2D Staircase                                                                                - Not Applicable-
    2E External Walls
                                          14mm thick in clay brick in composition mortar (1:3), 114mm thick in facing brick in composition
    2F Windows & External Doors           mortar (1:3), 800mm high (average) steel railing comprises of 15mm diameter circular hollow
                                          section (CHS), 25mm rectangular hollow section (RHS) and 75mm x 200mm x 800mm high steel
    2G Internal Walls & Partition         column well
    2H Internal Doors                     Natural anodised aluminium frame casement windows with clear glass, Econframe door, stainless

                                          steel grill door and phenolic door
                                          114mm thick in clay brick in composition mortar (1:3)
                                          Econframe door, glass door, aluminium louvered door, stainless steel grill door, phenolic door

     3 Finishes                           MML' ceramic glazed wall tiles, 'ICI' painting
    3A Internal Wall finishes             MML' matte homogeneous tiles, 'MML' non slip homogeneous tiles, vinyl tiles, and 'FOSROC
    3B Internal Floor Finishes            BRUSHBOND' as waterproofing
                                          BORAL plaster ceiling board, mineral fibre suspended ceiling, 'ICI Dulux painting
    3C Internal Ceiling Finishes          ICI Dulux Alkali resisting wall sealer, wall stone cladding, 'ALUCODRAND' aluminium composite
    3D External Finishes
                                          panel, SWISSMA PVDF coated aluminum strip ceilings

    4 Fittings and Furnishings                                               - Not Applicable-

    5 Services

    5A Sanitary Appliances                Medium range of sanitary fittings - squatting/padestal WC, urinal bowl, basin, basin tap, robe

                                          hook, paper holder, soup dispenser, hand dryer, shower shelf, hand bidet sprayer, floor trap,

                                          shower mixer, handicap grap bar, drainer sink, stainless steel bin, glass mirror

    5B Plumbing Installation              Cold water and sanitary plumbing.

    5C Refuse disposal                    - Not Applicable-

    5D Air-Conditioning & Ventilation     Air cooled split unit system, air cooled packaged, electrical wiring and mechanical ventilation

             System                       system.
    5E Electrical Installation            Complete electrical services, telephone, cctv

    5F Fire Protection Installation       Fire alarm system and portable fire extinguisher system.

    5G Lift & Conveyor Installation       - Not Applicable-

    5H Communication Installation         - Not Applicable-

    5J Special Installation               - Not Applicable-

    5K Builders's Profit & Attendance on  - Not Applicable-

             Services
    5L Builders's Work in Connection With - Not Applicable-

    Services

     6 External Works                     Site preparation and earthworks, Roadworks, Fencing, Landscaping
    6A Site Works                         Stormwater drainage systems, foul drainage system and water reticulation system which include
    6B Drainage
                                          all the fittings and accessories.
    6C External Services                  - Not Applicable-
    6D Ancillary Building                 Refuse Chamber, Guard House
    6E Recreation Facilities              - Not Applicable-

38
   33   34   35   36   37   38   39   40   41   42   43